Title
Enbridge determined to build Line 5 tunnel amid calls to shut down the Canada-U.S. pipeline
Enbridge, a Canadian energy company, is still waiting for a permit from the U.S. Army Corps of Engineers to build its proposed tunnel that would house a segment of its Line 5 pipeline. As Anishnaabe and environmental groups in the U.S. continue to ask for the complete closure of the pipeline, a delayed environmental impact statement is pushing the start of construction until at least 2026. Read the full story by CBC News.
Enbridge determined to build Line 5 tunnel amid calls to shut down the Canada-U…